Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
10.1. Specifications
10.2. Semiaxis removal
10.3. Semiaxis installation
10.4. Repair of a semiaxis and replacement of protective covers
10.5. Check of SHRUS
10.6. The bearing of an intermediate support of the right semiaxis
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



10-6-podshipnik-promezhutochnojj-opory-pravojj-poluosi.html

10.6. The bearing of an intermediate support of the right semiaxis

Replacement

PERFORMANCE ORDER
1. Remove right полуось.
2. Remove an internal SHRUS, the bearing and the bearing case.
3. Clamp полуось in a vice and press грязеотражатель hammer blows on оправке.
4. Hook and get a bearing cover from outside which is turned inside.
5. Get a lock ring of the bearing.
6. Press the bearing in gathering with the case from a semiaxis. If the bearing varies, it can be beaten out cautiously hammer blows on оправке.
7. Get a lock ring of the bearing from lateral aspect.
8. Get a bearing cover.
9. Выпрессуйте the bearing from the case blows on оправке which rests against an external holder.
10. Before assemblage put in the bearing greasing.
11. Запрессуйте the bearing in the case so that it was possible to establish a cover and a lock ring.
12. Establish an emphasis under an internal holder and запрессуйте in the bearing полуось blows on an end face through the wooden prorate so that it was possible to establish an internal lock ring.
13. Cautiously напрессуйте грязеотражатели.
14. Establish the SHRUS.
15. Establish полуось.


10.5. Check of SHRUS

11. Brakes