Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
12.1. Specifications
12.2. Bearings of naves of forward wheels
12.3. A rack of a forward suspension bracket
12.4. The bottom lever
12.5. A spherical support of the bottom lever
12.6. The stabilizer of cross-section stability of a forward suspension bracket
12.7. Bearings of back wheels
12.8. Details of a back suspension bracket
12.8.1. A rack of a back suspension bracket
12.8.2. Levers of a back suspension bracket
12.8.3. Bars
12.8.4. The nave case
12.8.5. The stabilizer of cross-section stability of a back suspension bracket
12.9. A wheel
12.10. The switch of ignition and the lock of blocking of a steering column
12.11. A steering column
12.12. The steering mechanism
12.13. Covers of steering transfer
12.14. A hydrodrive
12.15. The hydraulic booster pump
12.16. Tips of steering draught
13. A body
14. An electric equipment
 




6ac69956



12-8-2-rychagi-zadnejj-podveski.html

12.8.2. Levers of a back suspension bracket

Removal

PERFORMANCE ORDER
1. Lift a back part of the car and establish on supports.
2. Remove a wheel.
3. Turn away an axis nut (are specified by an arrow) levers on the nave case.
4. If levers vary, designate their position, having put labels on clowns of bolts of fastening of levers to arms of a body and on arms (clowns regulate a convergence of wheels).
5. Turn away a nut of bolts of fastening of levers to a body, get the clown and a bolt.
6. Remove levers (arrows specify nuts of bolts of fastening of levers to body arms). At removal remember an arrangement of bolts.

Check

PERFORMANCE ORDER
1. Check up a condition of levers and plugs.
2. Levers vary only in gathering with plugs.

Installation

PERFORMANCE ORDER
1. Establish levers in arms and pass bolts, having established them in a former order.
2. Put on washers and wrap new nuts.
3. Insert an axis of levers from the back party of the case of a nave, dress washers and wrap new nuts.
4. Establish a wheel and lower the car.
5. Roll the car forward and back, shake upwards – downwards.
6. Tighten a nut of an external axis of levers.
7. Expose clowns on labels, check up a convergence of back wheels and tighten nuts with the set moment (And – a negative convergence, In – a positive convergence, 1 – the right party, 2 – a left-hand side).
8. If it is impossible to check up a convergence, tighten nuts then address on a car repair shop.


12.8.1. A rack of a back suspension bracket

12.8.3. Bars