Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
3.1. The petrol engine in volume of 1,4 and 1,6 litres
3.1.1. Kinds of repair of the engine without dismantle from the car
3.1.1.1. Specifications
3.1.1.2. A compression
3.1.1.3. An order of installation of the piston of 1st cylinder in ВМТ a compression step
3.1.1.4. A cover of a head of the block of cylinders
3.1.1.5. A pulley коленвала
3.1.1.6. A cover of a chain drive of cam-shafts
3.1.1.7. Chains of a drive of cam-shafts
3.1.1.8. Натяжители and успокоители chains, drive asterisks
3.1.1.9. Backlashes in the mechanism of a drive of valves
3.1.1.10. Cam-shafts and pushers
3.1.1.11. A head of the block of cylinders
3.1.1.12. The oil pallet
3.1.1.13. The oil pump
3.1.1.14. Epiploons коленвала
3.1.1.15. A flywheel
3.1.1.16. Engine mount details
3.1.2. Dismantle and engine major repairs
3.2. The petrol engine in volume of 2,0 litres
3.3. The diesel engine
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



3-1-1-12-maslyanyjj-poddon.html

3.1.1.12. The oil pallet


Hermetic drawing on a pallet plane

1. A flute

2. An aperture

3. Inside

Removal

PERFORMANCE ORDER
1. Put the car on a manual brake, then lift a forward part of the car and establish on supports. Disconnect the battery from weight.
2. Turn away screws and remove a plastic guard under the engine.
3. Merge oil from the engine.
4. Disconnect a reception pipe of the muffler.
5. Turn away bolts and remove from both parties of the engine the small props connecting a check point with the block of cylinders (arrows specify places of fastening of a forward prop).
6. Turn away bolts and nuts of the oil pallet.
7. With palm blows open pallet consolidation, lower the pallet and get from under the car.
8. Turn away two bolts and remove маслоприемник with the filter of rough clearing and a ring lining.
9. Wash out the filter of rough clearing in solvent and check up presence of contaminations or damages. At any signs of damages replace маслоприемник in gathering with the filter.

Installation

PERFORMANCE ORDER
1. Clear of the consolidation rests demountable planes of the pallet and the block of cylinders, then wipe absolutely the pallet and internal surfaces of the engine.
2. In a flute маслоприемника lay a new ring lining (it is specified by an arrow), establish маслоприемник and tighten bolts.
3. Clear demountable planes and put hermetic on a flute stamped on the centre of the condensed surface of the pallet between apertures, and also from that party of apertures under bolts which is turned inside (see fig. hermetic Drawing on a pallet plane).
4. Establish the pallet on hairpins, tighten nuts and bolts with the set moment.
5. Establish check point props, tighten bolts.
6. Establish a reception pipe of the muffler.
7. Establish plastic guards under the engine.
8. Fill in in the engine fresh oil, replace the filter.


3.1.1.11. A head of the block of cylinders

3.1.1.13. The oil pump