Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
3.1. The petrol engine in volume of 1,4 and 1,6 litres
3.2. The petrol engine in volume of 2,0 litres
3.3. The diesel engine
3.3.1. Technical characteristics
3.3.2. A gear belt
3.3.3. Replacement of a lining of a head of cylinders
3.3.4. Valves
3.3.5. Replacement маслоотражательных caps of a core of the valve
3.3.6. Check of directing valves
3.3.7. Grinding in of a saddle of the valve
3.3.8. Processing of a head of cylinders / of valves
3.3.9. Check / adjustment of backlashes of valves
3.3.10. Compression check
3.3.11. A klinovyj belt
3.3.12. Malfunctions of the engine
3.3.13. System of greasing of the engine
3.3.14. Oil a contour
3.3.15. Removal and pallet installation картера
3.3.16. The oil pump
3.3.17. Cooling system
3.3.18. The injection device
3.3.19. Spark plugs
3.3.20. The power supply system
3.3.21. Check / replacement of the valve of a stopping delivery of fuel
3.3.22. Number of turns of idling and the maximum number of turns
3.3.23. Atomizers
3.3.24. The beginning of giving of the fuel pump of a high pressure
3.3.25. Operation during the winter period
3.3.26. Specifications of the power supply system of a diesel engine
3.3.27. A good advice for owners of the diesel car
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



3-3-15-snyatie-i-ustanovka-poddona-kartera.html

3.3.15. Removal and pallet installation картера

For pallet consolidation картера usual hermetic, for example, Loctite is used.


The prevention

Do not put too much hermetic, be especially cautious near to apertures of bolts. Details should be gathered within 5 minutes after hermetic drawing. After the expiration of this time hermetic should be removed and put anew.


Removal

PERFORMANCE ORDER
1. Disconnect a cable of weight from the battery.

The prevention

Electronic memory, for example, the store of malfunctions of the engine or a radio receiver code is thus erased. Before battery switching-off it is necessary to read instructions in subsection 7.2.


2. Lift the car.
3. Remove protection of the bottom of the engine.
4. Merge engine oil.
5. Remove the central beam.
6. Remove a reception pipe of the muffler.
7. Unscrew bolts of fastening of the pallet картера.
8. Hammer a wedge into consolidation between the block of cylinders and the pallet (arrows specify an arrangement of sealants). In workshops adaptation KV-10111100 which is driven in between the block of cylinders and the pallet картера is for this purpose applied.
9. If the adaptation is not present, it is possible to use an old knife. Cautiously drive in a knife with a hammer between the block and the pallet.

The prevention

At all do not hook the pallet a screw-driver or a chisel, without having cut preliminary consolidation. At removal watch, that has not been damaged уплотнитльная a pallet surface картера.


10. Remove the pallet картера.
11. It is recommended to remove the mesh filter at the removed pallet and to clear its filter in a cold cleaner.
12. Check up a grid on damages, for example, ruptures, if necessary replace.

Installation

PERFORMANCE ORDER
1. Cautiously clear sealing surfaces of the pallet and the block of the rests of consolidation by means of triangular шабера and razor edges.
2. Accurately wipe the block, the mechanism коленвала and the oil pump. Otherwise on pallet consolidation will flow down oil.
3. Screw the mesh filter with a new lining with effort 20 Н.м.
4. Degrease and dry up interfaced surfaces of the pallet and the block of cylinders. As a cleaner it is possible to use spirit or acetone.

The prevention

It is impossible to use the cleaners corroding a varnish surface.


5. Enclose new linings in both semicircular dredging of the pallet картера and on the ends from two parties cover with sealing means.
6. Put hermetic a strip the in width of 4-5 mm on all perimetre of a sealing surface of the oil pallet. Thus impose a hermetic strip between apertures of bolts in a flute (1) pallets. On apertures of bolts (2) impose a hermetic strip on a pallet inside on distance of 7 mm.
7. Establish the pallet картера on the block of cylinders. Wrap bolts at first a hand, then cross-wise (with 1 on 15) with effort 8 Н.м.

The prevention

Wait before pouring of oil of 30 minutes that hermetic has fallen asleep.


8. Establish a reception pipe of the muffler.
9. Establish the central beam.
10. Establish protection of the bottom of the engine.
11. Lower the car.
12. Fill in engine oil.
13. Connect a cable of weight of the battery.
14. If is, establish time for hours and enter a protective code of a radio receiver.
15. Make a trial trip, check up level of oil and tightness of consolidation of the pallet картера, in case of need, cautiously tighten all bolts.


3.3.14. Oil a contour

3.3.16. The oil pump