Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
3.1. The petrol engine in volume of 1,4 and 1,6 litres
3.2. The petrol engine in volume of 2,0 litres
3.3. The diesel engine
3.3.1. Technical characteristics
3.3.2. A gear belt
3.3.3. Replacement of a lining of a head of cylinders
3.3.4. Valves
3.3.5. Replacement маслоотражательных caps of a core of the valve
3.3.6. Check of directing valves
3.3.7. Grinding in of a saddle of the valve
3.3.8. Processing of a head of cylinders / of valves
3.3.9. Check / adjustment of backlashes of valves
3.3.10. Compression check
3.3.11. A klinovyj belt
3.3.12. Malfunctions of the engine
3.3.13. System of greasing of the engine
3.3.14. Oil a contour
3.3.15. Removal and pallet installation картера
3.3.16. The oil pump
3.3.17. Cooling system
3.3.18. The injection device
3.3.19. Spark plugs
3.3.20. The power supply system
3.3.21. Check / replacement of the valve of a stopping delivery of fuel
3.3.22. Number of turns of idling and the maximum number of turns
3.3.23. Atomizers
3.3.24. The beginning of giving of the fuel pump of a high pressure
3.3.25. Operation during the winter period
3.3.26. Specifications of the power supply system of a diesel engine
3.3.27. A good advice for owners of the diesel car
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



3-3-23-forsunki.html

3.3.23. Atomizers

Faulty atomizers can lead to a strong detonation of the engine and cause damage of bearings. At similar malfunctions leave the engine to idle, and weaken one after another накидные nuts of atomizers. If at easing of one of накидных nuts the detonation disappears, it specifies in a faulty atomizer.

The faulty atomizer can be found out also, easing one after another накидных nuts, at engine work on fast single to a course. If at easing накидной nuts the number of turns does not change, the corresponding atomizer means is faulty. The atomizer can be checked up by means of a manometre (it is carried out in a workshop). Demanded pressure of injection: 120–140 bar.

First signs of malfunction of atomizers are:

  – Faults in work of cylinders;
  – Knock in one or several cylinders;
  – An engine overheat;
  – Falling of capacity of the engine;
  – Too black exhaust gas;
  – The high expense of fuel.

Removal

PERFORMANCE ORDER
1. Cautiously clear outside a cold cleaner or solar oil топливопроводы a high pressure and returnable топливопроводы.
2. Remove топливопроводы a high pressure in the complete set, for this purpose ослабьте накидные nuts on the pump and atomizers прорезаннным накидным a key. Thus keep fastening by a usual key. Do not change the form of a bend of the pipeline.

The prevention

After removal топливопроводов stop up apertures with suitable stoppers that the dirt and foreign matters has not got.


3. Disconnect a returnable fuel hose.
4. Unscrew nuts of the returnable pipeline.

The prevention

Thus keep the pipeline for шестигранник a key, differently it can be bent or break.


5. Remove the returnable pipeline.
6. Turn out atomizers a face key and spread out them in an adjusting order. If necessary mark atomizers with a tape that they could be established on former places.
7. Cover apertures of atomizers that foreign matters have not got.
8. Take out linings of atomizers. It is necessary to replace linings necessarily.

The prevention

At all do not clean an atomizer or a needle of atomizers a wire or a file. Do not mix separate details of atomizers among themselves.


Installation

PERFORMANCE ORDER
1. Clear apertures of atomizers in a head of cylinders and necessarily establish four new heat-resistant linings. Deepening should be turned upwards. The arrow specifies to a head of cylinders.
2. Establish atomizers and tighten with effort 70 Н.м.

The prevention

Pulling of atomizers can lead to deformation of atomizers that in turn will lead to jamming of a needle or other malfunctions.


3. Establish the returnable pipeline with four new linings and screw up nuts with effort 45 Н.м.

The prevention

Thus keep the pipeline from проворачивания a key.


4. Establish топливопроводы a high pressure, tighten накидные nuts with effort 25 Н.м. Thus keep fastening from проворачивания.
5. On all atomizers slightly ослабьте накидные nuts топливопроводов a high pressure.
6. Turn the engine a starter while on high pressure pipelines fuel will not act.
7. Tighten накидные nuts with the ordered effort.
8. If necessary pump over fuel system the manual pump.


3.3.22. Number of turns of idling and the maximum number of turns

3.3.24. The beginning of giving of the fuel pump of a high pressure