Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
3.1. The petrol engine in volume of 1,4 and 1,6 litres
3.2. The petrol engine in volume of 2,0 litres
3.3. The diesel engine
3.3.1. Technical characteristics
3.3.2. A gear belt
3.3.3. Replacement of a lining of a head of cylinders
3.3.4. Valves
3.3.5. Replacement маслоотражательных caps of a core of the valve
3.3.6. Check of directing valves
3.3.7. Grinding in of a saddle of the valve
3.3.8. Processing of a head of cylinders / of valves
3.3.9. Check / adjustment of backlashes of valves
3.3.10. Compression check
3.3.11. A klinovyj belt
3.3.12. Malfunctions of the engine
3.3.13. System of greasing of the engine
3.3.14. Oil a contour
3.3.15. Removal and pallet installation картера
3.3.16. The oil pump
3.3.17. Cooling system
3.3.18. The injection device
3.3.19. Spark plugs
3.3.20. The power supply system
3.3.21. Check / replacement of the valve of a stopping delivery of fuel
3.3.22. Number of turns of idling and the maximum number of turns
3.3.23. Atomizers
3.3.24. The beginning of giving of the fuel pump of a high pressure
3.3.25. Operation during the winter period
3.3.26. Specifications of the power supply system of a diesel engine
3.3.27. A good advice for owners of the diesel car
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



3-3-7-pritirka-sedla-klapana.html

3.3.7. Grinding in of a saddle of the valve

The processed saddle and the new valve should be ground in to each other to provide the maximum consolidation.

Valves should be ground in only with small grinding paste. For necessary rotation on a valve plate the rubber sucker is established. Formation of grooves will be possible to avoid thanks to frequent приподниманию and to the further uniform rotation of the valve during grinding in process every which way.


The prevention

After grinding in it is necessary to delete grinding paste carefully.


Grinding in process can be checked up by the form a working surface or by means of fuel.

PERFORMANCE ORDER
Insert the valve, fill the chamber of combustion with gasoline, fuel should not follow from directing the valve, differently repeat grinding in.


3.3.6. Check of directing valves

3.3.8. Processing of a head of cylinders / of valves