Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Cooling system
4.1. Specifications
4.2. Hoses of system of cooling
4.3. A radiator
4.4. The thermostat
4.5. The electrofan
4.6. Gauges and switches of system of cooling
4.7. The pump of a cooling liquid
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



4-3-radiator.html

4.3. A radiator

Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Merge cooling liquid.
3. Disconnect from a radiator top and the bottom hoses (are specified by arrows) and a hose of a broad tank.
4. Remove the fan () and a casing.
5. Turn away bolts of the top arms of a radiator.
6. Remove arms and rubber pillows.
7. Cautiously incline a radiator, remove (arrows specify the bottom fastenings), get the bottom pillows.

Check

PERFORMANCE ORDER
1. Clear a radiator outside if there are suspicions on contaminations of internal channels wash out from within.
2. It is recommended to be convinced of cleanliness of internal channels by check of their throughput (it is carried out on a car repair shop).
3. Check up tightness of a radiator (it is carried out on a car repair shop).
4. Check up a condition of rubber pillows, if necessary replace.

Installation

PERFORMANCE ORDER
1. Installation is carried out upside-down with observance of following rules.
2. Be convinced that rubber plugs of a radiator have entered into assembly eyes.
3. Fill system of cooling with a liquid.


4.2. Hoses of system of cooling

4.4. The thermostat