Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Cooling system
5. Heating and ventilation system
5.1. Details of system of heating and ventilation
5.1.1. The management block
5.1.2. A regulator cable
5.1.3. A heater
5.1.4. A heater radiator
5.1.5. The fan electric motor
5.1.6. The resistor of the electric motor of the fan
5.1.7. Electric motors air заслонок
5.2. The conditioner
5.3. Conditioner units
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



5-1-5-ehlektrodvigatel-ventilyatora.html

5.1.5. The fan electric motor

Removal

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Remove перчаточный a box, having turned away two screws.
3. Remove the bottom panel from outside the passenger, having turned away three screws.
4. Remove an arm перчаточного a box.
5. Disconnect hoses of air lines in the basis of the case of the electric motor.
6. Turn away screws and get the electric motor.
7. Put labels on disconnected arms.

Installation

PERFORMANCE ORDER
Installation is carried out upside-down. Establish arms on the put labels and attach hoses of air lines.


5.1.4. A heater radiator

5.1.6. The resistor of the electric motor of the fan