Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
6.1. Carburettor engines
6.1.1. Specifications
6.1.2. The air filter
6.1.3. A temperature regulator of a stream of air
6.1.4. The fuel pump
6.1.5. The gauge of level of fuel
6.1.6. A fuel tank
6.1.7. A cable of a drive throttle заслонки
6.1.8. A pedal of management throttle заслонкой
6.1.9. Fuel
6.1.10. The carburettor
6.1.11. Gauges and carburettor valves
6.1.12. A soaking up collector
6.1.13. A final collector
6.1.14. An exhaust system
6.2. Engines with system of injection of fuel
6.3. System of a food / of release of the fulfilled gases
6.4. System of decrease in toxicity of the fulfilled gases
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



6-1-14-vykhlopnaya-sistema.html

6.1.14. An exhaust system

On cars without neutralizer the exhaust system consists of 3 sections – a reception pipe, intermediate section with the resonator and terminal section with the muffler.

On cars with neutralizer the exhaust system consists of 4 sections – the same 3 sections and neutralizer section.

On all length of a pipe of an exhaust system are suspended on rubber support, pipes are connected by flanges.

Removal

Each of sections can be dismantled irrespective of the others. It is possible to remove also at once all system.

PERFORMANCE ORDER
1. Lift the car and establish on supports (or call in on a hole or a platform).
Reception pipe
2. Turn away a nut of fastening of a reception pipe to a collector.
3. Turn away a bolt of fastening of a pipe to an arm.
4. Disconnect a pipe from a collector, remove a lining.
5. Disassemble фланцевое connection and remove a pipe and a lining.
Neutralizer (on a part of cars)
6. Turn on two nuts and two bolts of fastening of a pipe to neutralizer.
7. Turn away two bolts of fastening of an intermediate pipe to neutralizer.
8. Remove neutralizer and linings.
Intermediate pipe
9. On cars with neutralizer turn away two bolts of fastening of an intermediate pipe and remove a lining.
10. On cars without neutralizer turn on two nuts and two bolts of fastening, remove springs and disconnect an intermediate pipe from a reception pipe. Remove a lining.
11. On all cars turn away a bolt of a rubber pillow in a back part of an intermediate pipe.
12. Turn away bolts of fastening of an intermediate pipe to a terminal pipe of the muffler.
13. Remove an intermediate pipe and a lining.
Terminal section of the muffler
14. Turn away two bolts of fastening to an intermediate pipe.
15. Unhook extensions and remove section.
All system
16. Turn away a nut of fastening of a reception pipe to a collector and a fastening bolt to an arm, disconnect a pipe from a collector, remove a lining.
17. Working with the assistant, disconnect system from rubber pillows and remove from the car.
Thermal guards
18. Guards are established on a part of cars and fasten nuts, bolts and скобами.

Installation

PERFORMANCE ORDER
1. Installation is carried out upside-down.
2. Before assemblage replace linings and clear demountable surfaces.
3. Check up a condition of pillows, if necessary replace.
4. Be convinced that between pipes and the bottom there are sufficient gleams.


6.1.13. A final collector

6.2. Engines with system of injection of fuel