Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
6.1. Carburettor engines
6.2. Engines with system of injection of fuel
6.2.1. Specifications
6.2.2. The air filter
6.2.3. A cable of a drive throttle заслонки
6.2.4. A pedal of management throttle заслонкой
6.2.5. Fuel
6.2.6. System of injection of fuel
6.2.7. Декомпрессия fuel system
6.2.8. The fuel pump
6.2.9. The gauge of level of fuel
6.2.10. A fuel tank
6.2.11. System of injection of fuel
6.2.12. The case throttle заслонки
6.2.13. Units of system of injection of fuel
6.2.14. A soaking up collector
6.2.15. A final collector
6.2.16. An exhaust system
6.3. System of a food / of release of the fulfilled gases
6.4. System of decrease in toxicity of the fulfilled gases
7. System of start-up of the engine
8. Coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



6-2-14-vsasyvayushhijj-kollektor.html

6.2.14. A soaking up collector

Removal

PERFORMANCE ORDER
1. Merge a part cooling liquid.
2. Execute the actions described in subitem 1-6 of subsection 6.2.12.
3. Disconnect all details from the case заслонки.
4. Disconnect from a collector all hoses, preliminary them having designated.
5. Disconnect from a collector a tube рециркуляции (the arrow specifies a nut of the union of a tube рециркуляции).
6. Disconnect sockets from atomizers and from the gauge of temperature of a cooling liquid, remove wires of connection with weight (arrows specify screws of fastening of plugs of connections with weight in the right part of a collector).
7. Remove a collector rack.
8. Execute декомпрессию fuel system and disconnect fuel hoses from the fuel distributor, hoses immediately muffle.
9. Be convinced that all wires and hoses are disconnected, turn away a nut and bolts. Working in return sequence.
10. Remove a collector and a lining.

Installation

PERFORMANCE ORDER
1. Installation is carried out upside-down.
2. Before assemblage replace a lining, carefully having cleared demountable planes.
3. Track correctness of connection of hoses and wires.
4. Tighten nuts and bolts in the specified sequence.


6.2.13.16. The gauge of speed of the car

6.2.15. A final collector