Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
8.1. Specifications
8.2. Coupling adjustment
8.3. A coupling cable
8.4. A coupling pedal
8.5. Coupling
8.6. The mechanism of deenergizing of coupling
9. Transmissions
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



8-6-mekhanizm-vyklyucheniya-scepleniya.html

8.6. The mechanism of deenergizing of coupling

Removal

PERFORMANCE ORDER
1. Remove a check point (subsection 9.1 see).
2. Remove выжимной the bearing, having got скобы.
3. Beat out pins (are specified by arrows) and remove a plug from an axis.
4. Designate spring orientation, remove the lever, a plug and a spring.

Check

PERFORMANCE ORDER
1. Check up a condition of the details, the worn out details replace.
2. Beat out the plug of an axis and replace.
3. Replace выжимной the bearing at the slightest signs of damages.

Installation

PERFORMANCE ORDER
1. Grease rubbing surfaces of an axis with refractory greasing.
2. Establish the plug lever in a place.
3. Establish a plug and a spring, push the lever against the stop.
4. Combine apertures of a plug and запрессуйте new pins.
5. Establish скобы (are specified by arrows), slightly grease a shaft and the bearing.
6. Establish the bearing so that скобы have entered into gearing with a plug.
7. Check up freedom of moving of a plug on an axis.
8. Establish a check point.


8.5. Coupling

9. Transmissions