Service Nissan Sunny with 1991 on 1997 of release in a body n-14.
1. The maintenance instruction
2. Maintenance service
3. Engines
4. Cooling system
5. Heating and ventilation system
6. Fuel and an exhaust system
7. System of start-up of the engine
8. Coupling
9. Transmissions
9.1. A mechanical transmission
9.2. An automatic transmission
9.2.1. Specifications
9.2.2. A cable of management of transmission
9.2.3. The selector
9.2.4. A switching cable for the lowered speed
9.2.5. A speedometer reducer
9.2.6. Epiploons
9.2.7. The double switch of a backing and starter blocking
9.2.8. The overload switch
10. Semiaxes
11. Brakes
12. Suspension brackets and a steering
13. A body
14. An electric equipment
 




6ac69956



9-2-7-dvojjnojj-pereklyuchatel-zadnego-khoda-i-blokirovki-startera.html

9.2.7. The double switch of a backing and starter blocking


Adjustment of the double switch

1. The switch lever

2. The lever of the selector of transmission

3. Apertures for adjustment

4. A drill of 4 mm

The switch will screw in a forward part картера transmissions and carries out two functions – prevents starter inclusion only in positions of selector N or P and includes a backing signal in position of selector R.

Check

PERFORMANCE ORDER
1. If the starter joins in other positions than N or P the switch is faulty, or its adjustment is broken.
2. If the tail light the switch should be checked up does not join also.
3. Lift a forward part of the car and establish on supports.
4. Disconnect from the switch a socket.
5. Check up resistance between conclusions in selector N positions, P or R. At the serviceable switch in positions of selector N and P contacts 1 and 2 are closed, and in selector R position contacts 3 and 4 are closed.
6. If these contacts do not become isolated, release bolts of fastening and adjust the switch.
7. If adjustment does not give result the switch replace.

Removal

PERFORMANCE ORDER
1. Lift a forward part of the car and establish on supports.
2. Disconnect a socket.
3. Turn away three bolts, get the switch from the selector mechanism.

Installation

PERFORMANCE ORDER
1. Establish the switch, tighten bolts.
2. Translate the selector in position N.
3. Insert into an aperture in the top part of the selector a drill in diameter of 4 mm and pass in an aperture of the lever of the switch.
4. Tighten bolts and get a drill.
5. Attach wires and check up switch work.


9.2.6. Epiploons

9.2.8. The overload switch